BlueBird Commences Exploration at the Ashburton Cobalt Project, Western Australia

Loading...
Loading...

VANCOUVER, Nov. 14, 2018 /PRNewswire/ - BlueBird Battery Metals Inc. BATTBBBMF (the "Company" or "BlueBird") is pleased to announce that the initial exploration of its 100%-owned Ashburton Project is commencing. The Ashburton Project, located 315 km south of Karratha and 950 km north of Perth in Western Australia (Ref. Figure 1), is comprised of four tenements (189 km2), located along the highly prospective Talga Fault Zone ("TFZ"). The tenements include over 30 km of strike length along the TFZ where historical surface sampling returned anomalous cobalt values greater than 0.10% Co associated with extensive manganese mineralization that extends for over 60 km along the TFZ (Ref. Table 1). The manganese mineralization was the focal point of historical sampling programs but the presence of cobalt mineralization offers significant exploration upside.

The first phase of exploration will consist of ground reconnaissance mapping and sampling focused on areas where historical surface sample results, collected by others, yielded highly anomalous cobalt values (Ref. Table 1 and Figure 2). Reconnaissance-scale mapping and sampling will be undertaken to evaluate selected target areas to verify the historical results. In addition, the Company plans to collect a number of 15-30 kg samples that will be analyzed using acid leach analytical methods to evaluate the recoverability of the cobalt-manganese mineralization.

Table 1 - Selected Surface Rock Chip Results – Ashburton Project

Sample

Easting

Northing

Ba ppm

Co ppm

Co %

Cu ppm

Mn %

Mo ppm

Ni ppm

Zn ppm

109682

480684

7386325

3000

3110

0.31

1570

37.6

3.5

1480

1270

CAPR0461

513000

7365230

793

3060

0.31

210

16.7

0.5

986

1180

109691

479125

7387008

1090

2500

0.25

666

17.2

3.0

394

452

108542

477898

7389615

782

2300

0.23

1440

6.5

88.0

1660

331

CAPR0024

430184

7414361

65400

2150

0.22

712

25.6

0.0

0

696

109681

480702

7386075

853

2130

0.21

332

17.5

12.0

392

630

CAPR0042

434478

7412365

12600

1760

0.18

706

13.1

18.0

540

594

CAPR0068

446709

7413236

99

1670

0.17

998

11.8

4.0

3560

4840

109812

480680

7386330

983

1430

0.14

496

8.6

3.0

656

370

101504

477474

7389296

9400

1400

0.14

372

8.3

0.5

456

322

109687

479239

7386866

1920

1130

0.11

470

11.0

4.5

410

286

CAPR0437

480925

7385865

387

1090

0.11

196

0.9

3.0

528

634

CAPR0442

488470

7380690

47100

1050

0.11

8

21.2

1.0

22

82

 

Table 1 includes selected results from historical surface rock chip sampling of the Ashburton Project. There are no assurances that the Company will be able to duplicate these results.

Figure 1 - Ashburton Project Location Map (CNW Group/Bluebird Battery Metals)

Figure 2 - Historical Rock Chip Sample Results (CNW Group/Bluebird Battery Metals)

"The Company is eager to begin this initial phase of exploration at Ashburton. Emerging technological advancements in sulfuric acid leaching of manganese cobalt mineralization elsewhere in Australia is demonstrating considerable potential for robust recoveries producing a low cost, manganese - cobalt sulphate product. This initial exploration work, in addition to confirming and expanding the historical anomalous cobalt grades, will provide sufficient sample material to perform bench-scale metallurgical testing to confirm the viability of sulfuric leaching of the Ashburton mineralization," commented Gary Nassif, President of BlueBird.

About the Ashburton Project

Cobalt and manganese mineralization occurs largely within a 4-km thick sequence of sediments and dolomites paralleling the NW trend of the TFZ. The TFZ is a regional-scale structural suture zone between the meta-sedimentary and meta-volcanic rocks of the Ashburton Basin with the meta-sedimentary and meta-igneous rocks of the Gascoyne Complex.

Historical surface rock geochemical sampling completed by others was focused on evaluating the extensive manganese mineralization within the sediments and dolomites paralleling the TFZ. This sample population was not extensively assayed for cobalt until late in the history of the Project. The limited amount of samples assayed for cobalt returned values ranging from trace to 0.311% (Ref. Table 1). The initial exploration program will focus largely on the Jessica Bore tenements (Ref. Figure 2), where historical sampling returned the highest number of anomalous cobalt values.  The Company anticipates receiving results from this initial phase of exploration by the end of 2018.

"The commencement of field-based exploration across the Ashburton Cobalt-Manganese Project represents the first campaign undertaken across the property that specifically targets the cobalt potential.  Cobalt results returned to date from the property are extremely encouraging and our goal with this initial phase of exploration work is to delineate the scale-potential of these targets," commented Nav Dhaliwal, CEO of BlueBird.

The technical content of this news release has been reviewed and approved Wesley Hanson, P.Geo., a director of the Company and a Qualified Person pursuant to National Instrument 43-101. The qualified person has not yet visited the Ashburton Project and therefore has not yet verified the data disclosed, including sampling, analytical, and test data underlying the information or opinions contained in the written disclosure.

Loading...
Loading...

About BlueBird Battery Metals

BlueBird Battery Metals BATTBBBMF is a Canadian publicly listed company focused on the exploration and development of strategic battery metals projects, primarily cobalt and nickel. BlueBird's goal is to pursue a business model that offers direct and long-term leverage to the price appreciation in nickel and cobalt, two principal materials in EV batteries. The Company plans to become a leader in the battery metals sector as cobalt is currently in a global supply deficit, has a vulnerable supply chain, and is part of an emerging sector with extraordinary potential. BlueBird is advancing its portfolio of battery metals-focused assets in Western Australia and is currently reviewing new acquisition opportunities to add to the Company's project portfolio.

On Behalf of the Board of BlueBird Battery Metals Inc.

Nav Dhaliwal
Chief Exeuctive Officer

This news release may contain or refer to forward-looking information based on current expectations, including, but not limited to the Company achieving success in exploring its properties and the impact on the Company of these events, including the effect on its share price. Forward-looking information is subject to significant risks and uncertainties, as actual results may differ materially from forecasted results. Forward-looking information is provided as of the date hereof and we assume no responsibility to update or revise such information to reflect new events or circumstances. References to other issuers with nearby projects is for information purposes only and there are no assurances the Company will achieve similar results.

Neither TSX Venture Exchange, the Toronto Stock Exchange nor their Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Bluebird Battery Metals (CNW Group/Bluebird Battery Metals)

SOURCE Bluebird Battery Metals

Loading...
Loading...
Market News and Data brought to you by Benzinga APIs
Posted In: Press Releases
Benzinga simplifies the market for smarter investing

Trade confidently with insights and alerts from analyst ratings, free reports and breaking news that affects the stocks you care about.

Join Now: Free!

Loading...