Loading...
Loading...
Foster Wheeler AG
FWLT announced today that a subsidiary of its
Global Power Group has been awarded a contract by Elektrobudowa S.A. for the
design, supply and erection of a 50 MWe (gross megawatt electric) circulating
fluidized-bed (CFB) boiler island for the Tychy Heat and Power Station in
Poland, which is owned by TAURON Polska Energia S.A.
Foster Wheeler has received a full notice to proceed on this contract, and the
contract value will be included in the company's bookings for the
third-quarter of 2013. Commercial operation of the new steam generator is
scheduled for the middle of 2016.
Foster Wheeler will design and supply the steam generator and auxiliary
equipment, and will carry out the erection and commissioning of the boiler
island. The steam generator will be designed to burn local Polish bituminous
coal.
© 2024 Benzinga.com. Benzinga does not provide investment advice. All rights reserved.
Benzinga simplifies the market for smarter investing
Trade confidently with insights and alerts from analyst ratings, free reports and breaking news that affects the stocks you care about.
Join Now: Free!
Already a member?Sign in