A summary of exploration planned for this spring at Junction includes:
There are two key results from the gravity survey, as illustrated on the attached maps:
The Company will provide further details on 2018 surface exploration at Junction as work unfolds. This phase of geological mapping, soil geochemistry, airborne magnetics and radiometrics, and ground-based IP test lines should be completed within the next two months.
About The Junction Property
The Junction property consists of 179 claims covering 3,698 acres (1,497 hectares) in an area approximately 7.5 by 3 kilometres in size. The property is on land administered by the federal Bureau of Land Management (BLM), and is outside of the BLM's broadly defined area of proposed sage grouse protection.
Technical Information
Technical information for this news release has been prepared in accordance with the Canadian regulatory requirements set out in National Instrument 43-101, and reviewed on behalf of the Company by Dr. Michael Gunning P.Geo., a non-independent Qualified Person.
About VR Resources
ON BEHALF OF THE BOARD OF DIRECTORS:
"Michael H. Gunning"
_____________________________
Dr. Michael H. Gunning, PhD, PGeo
President & CEO
Forward Looking Statements
All of the Company's public disclosure filings may be accessed via www.sedar.com and readers are urged to review these materials.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in Policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
© 2026 Benzinga.com. Benzinga does not provide investment advice. All rights reserved.
To add Benzinga News as your preferred source on Google, click here.
