VANCOUVER, BRITISH COLUMBIA--(Marketwired - Aug. 14, 2014) - Silvercorp Metals Inc. ("Silvercorp" or the "Company") SVMSVM reported its financial and operating results for the first quarter ended June 30, 2014 ("Q1 Fiscal 2015").

The Company is pleased that operational improvements enacted in the prior fiscal year have attributed to favourable results in all aspects of operations. Compared to the same quarter last year, silver head grade improved from 200 grams per tonne ("g/t") to 227 g/t, lead head grade increased from 2.7% to 3.3%, cash mining cost decreased 16% to $42.77 per tonne, and overhead costs decreased by 36% to $4.8 million in Q1 Fiscal 2015. Combined with more efficient capital spending, the Company's cash and short-term investments balance increased to $80.2 million as at the end of the quarter.

FIRST QUARTER HIGHLIGHTS



-- Silver production (excluding GC mine metal production) of 1.1 million
ounces and gold production of 3,461 ounces;
-- Lead production of 11.5 million pounds and zinc production of 1.2
million pounds;
-- Sales of $30.6 million;
-- Gross margin of 51%;
-- Cash flows from operations of $13.8 million, or $0.08 per share;
-- Net income of $2.7 million, or $0.02 per share;
-- Cash cost per ounce of silver, net of by-product credits, of $0.46;
-- All-in sustaining cost per ounce of silver, net of by-product credits,
of $11.62; and
-- Trial mining at the GC mine produced 48,396 tonnes of ore yielding an
additional 145,000 ounces of silver, 1.5 million pounds of lead, and 2.3
million pounds of zinc.



FINANCIALS

In Q1 Fiscal 2015, net income attributable to equity holders of the Company was $2.7 million or $0.02 per share compared to $4.6 million, or $0.03 per share for the three months ended June 30, 2013 ("Q1 Fiscal 2014").

In the current quarter, the Company's financial results were mainly impacted by the following: (i) improved production cost control yielded higher profit margins of 51% compared to 44% in the same prior year quarter, (ii) general and administrative spending declined by 36% from the prior year quarter, offset by (iii) lower metal production as silver, lead and zinc production decreased 18%, 14%, and 67%, respectively and (iv) lower net realized silver price of $15.79 per ounce, which is 11% lower compared to $17.66 per ounce in the same prior year quarter.

In Q1 Fiscal 2015, the Company realized sales of $30.6 million, a decrease of 23% from $39.8 million in Q1 Fiscal 2014. Metal sales were mainly impacted by a lower net realized silver price and lower production, offset by higher head grades achieved.

Cost of sales in Q1 Fiscal 2015 was $15.0 million compared to $22.5 million in Q1 Fiscal 2014 and included cash costs of $11.9 million compared to $18.9 million in Q1 Fiscal 2014. The decrease in cost of sales is attributable to an overall decrease of 11% in production costs and 20% less ore production in the quarter compared to the prior year period.

The gross profit margin in Q1 Fiscal 2015 was 51% compared to 44% in Q1 Fiscal 2014. The increase in gross profit is mainly driven by the reduction of production cost offset by decreases in silver prices.

Cash flows from operations in Q1 Fiscal 2015 were $13.8 million or $0.08 per share, compared to $17.7 million, or $0.10 per share, in Q1 Fiscal 2014.

OPERATIONS

In Q1 Fiscal 2015, the Company produced 1.1 million ounces of silver, 3,461 ounces of gold, 11.5 million pounds of lead, and 1.2 million pounds of zinc, compared to 1.4 million ounces of silver, 3,777 ounces of gold, 13.5 million pounds of lead, and 3.7 million pounds of zinc, respectively, in Q1 Fiscal 2014. Metal production in this quarter was positively impacted by improved dilution control, which resulted in a 14% and 23% increase in silver and lead head grades. This was offset by a 20% decrease in ore mined which resulted in overall lower metal production.

Including the trial mining production from the GC mine, the total metal production in the quarter was 1.27 million ounces of silver, 13.0 million pounds of lead and 3.5 million pounds of zinc.

1. Ying Mining District, Henan Province, China

In Q1 Fiscal 2015, the total ore mined at the Ying Mining District was 173,485 tonnes compared to total ore production of 233,257 tonnes in Q1 Fiscal 2014. In the current quarter, the Company's ongoing focus on dilution control resulted in 26% lower ore production. As a result of improved dilution control, silver and lead head grades at the Ying Mining District improved 14% and 23%, respectively, to 227 g/t for silver and 3.3% for lead, from 200 g/t for silver and 2.7% for lead, respectively, in Q1 Fiscal 2014.

In Q1 Fiscal 2015, the Ying Mining District produced 1.1 million ounces of silver, 822 ounces of gold, 11.5 million pounds of lead, and 1.2 million pounds of zinc, compared to 1.4 million ounces of silver, 1,282 ounces of gold, 13.1 million pounds of lead, and 2.9 million pounds of zinc in Q1 Fiscal 2014. The decrease in metals produced is mainly due to the lower ore production offset by improved head grades experienced in the quarter.

The cost control initiatives at the Ying Mining District yielded positive results in Q1 Fiscal 2015 where total and cash mining costs per tonne were $58.35 and $46.96, a 10% and 15% decrease, respectively, compared to $65.09 and $54.95, in Q1 Fiscal 2014. The overall decrease of 15% in cash mining costs per tonne was mainly due to reductions in (i) mining preparation expenditures; (ii) labour and material costs; and (iii) mine administration costs. On a per tonne basis, labour costs decreased 40%, mine administration costs decreased 33% and mining preparation expenditures decreased 18%, respectively, as compared to Q1 Fiscal 2014.

On the foundation of production cost efficiencies and lower overhead administrative costs, the all-in sustaining cost per ounce of silver, net of by-product credits, in this quarter, improved to $8.85 compared to $11.36 in the prior year quarter.

In Q1 Fiscal 2015, total ore milled was 169,480 tonnes, a decrease of 28% compared to 236,173 tonnes in Q1 Fiscal 2014. Cash milling costs were $12.16 compared to $12.06 in Q1 Fiscal 2014.

The consolidated operational results for the past five quarters at the Ying Mining District are summarized in the table below:



---------------------------------------------------------------------------
Quarterly operational results - Ying Mining District

Q1 2015 Q4 2014 Q3 2014 Q2 2014 Q1 2014
30-Jun-14 31-Mar-14 31-Dec-13 30-Sep-13 30-Jun-13
---------------------------------------------------------------------------
Ore Mined (tonne)
Direct Smelting Ore
(tonne) 928 393 715 503 963
Stockpiled Ore (tonne) 172,557 89,664 148,135 152,599 232,294
--------------------------------------------------
173,485 90,057 148,850 153,102 233,257
---------------------------------------------------------------------------
Run of Mine Ore (tonne)
Direct Smelting Ore
(tonne) 928 393 715 503 963
Ore Milled (tonne) 168,552 90,879 149,040 156,790 235,210
--------------------------------------------------
169,480 91,272 149,755 157,293 236,173
---------------------------------------------------------------------------
Metal Sales
Silver (in thousands of
ounces) 1,126 582 883 1,021 1,364
Gold (in thousands of
ounces) 0.8 0.4 0.9 0.9 1.3
Lead (in thousands of
pounds) 11,529 5,165 8,814 9,519 13,063
Zinc (in thousands of
pounds) 1,211 883 1,572 2,199 2,926
---------------------------------------------------------------------------
Head Grade of Run of Mine
Ore
Silver (gram/tonne) 227 216 202 217 200
Lead (%) 3.3 2.7 2.9 2.9 2.7
Zinc (%) 0.7 0.6 0.7 1.0 0.8
---------------------------------------------------------------------------
Recovery Rate of Run of
Mine Ore
Silver (%) 93.6 92.9 93.1 92.7 92.3
Lead (%) 95.8 95.3 95.7 94.8 94.6
Zinc (%) 56.8 62.4 64.2 68.5 68.4
---------------------------------------------------------------------------
Cash Mining Cost ($ per
tonne) 46.96 49.04 50.59 45.22 54.95
Total Mining Costs($ per
tonne) 58.35 60.85 60.89 56.08 65.09
Cash Milling Cost ($ per
tonne) 12.16 15.08 16.00 14.89 12.06
Total Milling Cost ($ per
tonne) 14.48 19.93 18.60 17.29 13.62
---------------------------------------------------------------------------
Cash Cost per Ounce of
Silver ($) 0.46 2.82 2.00 0.49 3.23

Total Production Cost per
Ounce of Silver ($) 2.92 5.86 4.39 3.41 5.33
---------------------------------------------------------------------------



2. BYP Mine, Hunan Province, China

In Q1 Fiscal 2015, the BYP mine processed 30,548 tonnes of ore compared to 29,975 tonnes in Q1 Fiscal 2014. In Q1 Fiscal 2015, the Company sold 2,639 ounces of gold compared to 2,338 ounces of gold in Q1 Fiscal 2014. Gold head grade for Q1 Fiscal 2015 was 2.8 g/t compared to 2.8 g/t in Q1 Fiscal 2014.

Certain capital upgrades are necessary at the BYP mine in order to sustain ongoing production. However, in consideration of the required expenditures and the current market environment, the Company has decided to defer such capital investments until a later time. As such, in August 2014, the Company has suspended mining activities at the BYP mine. As the BYP mine is not viewed as a core asset, the Company is considering various strategic options for this project.

Exploration and development expenditures at the BYP mine were $0.3 million in the current quarter compared to $1.6 million in the prior year quarter.

DEVELOPMENT AND EXPLORATION

1. Ying Mining District, Henan Province, China

During the quarter, the Company completed approximately 16,500 metres ("m") of horizontal tunnels, raises and declines. Total exploration and development expenditures for the Ying Mining District were $8.1 million compared to $9.7 million in Q1 Fiscal 2014.

2. GC Project, Guangdong Province, China

During the quarter, with the temporary Safety Production Permit, the Company continued mine development, ramping up trial mining production, mill processing and stope preparation work. As at the end of July, the Company has passed the final site inspection for the Safety Production Permit. The issuance of the final Safety Production Permit is expected prior to the expiration of the temporary permit which was extended to the end of September 2014.

As part of trial mining activities in Q1 Fiscal 2015, the Company mined 48,396 tonnes of ore and milled 55,784 tonnes of ore, yielding 145,000 ounces of silver, 1.5 million pounds of lead, 2.3 million pounds of zinc and 3.6 million pounds of sulphur. The head grades at the GC mine were 110 g/t for silver, 1.4% for lead, 2.5% for zinc, and 9.0% for sulphur.

Total and cash mining cost per tonne were $64.62 and $42.23 respectively, while total and cash milling cost per tonne were $25.54 and $19.17. A summary of the operational and financial results(1) of the GC mine are as follows:



---------------------------------------------------------------------
Three months ended
GC Mine June 30, 2014
---------------------------------------------------------------------
Ore mined (tonne) 48,396
Ore milled (tonne) 55,784
---------------------------------------------------------------------
Head Grades
---------------------------------------------------------------------
Silver (gram/tonne) 110
Lead (%) 1.4
Zinc (%) 2.5
Sulphur (%) 9.0
---------------------------------------------------------------------
Metal Production
---------------------------------------------------------------------
Silver ('000 Oz) 145
Lead ('000 Lb) 1,461
Zinc ('000 Lb) 2,314
Sulphur ('000 Lb) 3,626
---------------------------------------------------------------------
Production Cost
---------------------------------------------------------------------
Cash production cost ($/tonne) $ 61.40
Total production cost ($/tonne) $ 90.16
---------------------------------------------------------------------
Financials
---------------------------------------------------------------------
Metal sales ('000s) $ 4,437
Cash production cost ('000s) $ 2,993
Total production cost ('000s) $ 4,376
Cash profit margin (%) 33%
---------------------------------------------------------------------



(1) Production in the trial mining phase at the GC mine is excluded from the Company's total reported production results on page 10. Revenue from metal sales is offset against cost capitalized.

Based on the operational results in this quarter, the Company is pleased that the GC mine is approaching its expected operational level in accordance to the guidance for this fiscal year. Prior to declaration of commercial production, the Company will continue to ramp up mining in the coming quarters to reach operational results that consistently and sustainably achieve our planned production. While the GC mine has not declared commercial production, revenue from metal sales is offset against costs capitalized.

In Q1 Fiscal 2015, $0.4 million (Q1 Fiscal 2014 - $6.2 million) of exploration and development expenditures were incurred at the GC mine.

Myles Gao, P.Geo., President & CEO, is the Qualified Person for Silvercorp under NI 43-101 and has reviewed and given consent to the technical information contained in this News Release.

This earnings release should be read in conjunction with the Company's Management Discussion & Analysis, Financial Statements and Notes to Financial Statements for the corresponding period, which have been posted on SEDAR at www.sedar.com and are also available on the Company's website at www.silvercorp.ca. All figures are in United States dollars unless otherwise stated.

About Silvercorp

Silvercorp is a low-cost silver-producing Canadian mining company with multiple mines in China. The Company is currently developing the GC project in southern China which it expects will become its next operating mine. The Company's vision is to deliver shareholder value by focusing on the acquisition of under developed projects with resource potential and the ability to grow organically. For more information, please visit our website at www.silvercorp.ca.

CAUTIONARY DISCLAIMER - FORWARD LOOKING STATEMENTS

Certain of the statements and information in this press release constitute "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward-looking information" within the meaning of applicable Canadian provincial securities laws. Any statements or information that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects", "is expected", "anticipates", "believes", "plans", "projects", "estimates", "assumes", "intends", "strategies", "targets", "goals", "forecasts", "objectives", "budgets", "schedules", "potential" or variations thereof or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-looking statements or information. Forward-looking statements or information relate to, among other things: the price of silver and other metals; the accuracy of mineral resource and mineral reserve estimates at the Company's material properties; the sufficiency of the Company's capital to finance the Company's operations; estimates of the Company's revenues and capital expenditures; estimated production from the Company's mines in the Ying Mining District; timing of receipt of permits and regulatory approvals; availability of funds from production to finance the Company's operations; and access to and availability of funding for future construction, use of proceeds from any financing and development of the Company's properties.

Forward-looking statements or information are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those reflected in the forward-looking statements or information, including, without limitation, risks relating to: fluctuating commodity prices; calculation of resources, reserves and mineralization and precious and base metal recovery; interpretations and assumptions of mineral resource and mineral reserve estimates; exploration and development programs; feasibility and engineering reports; permits and licences; title to properties; property interests; joint venture partners; acquisition of commercially mineable mineral rights; financing; recent market events and conditions; economic factors affecting the Company; timing, estimated amount, capital and operating expenditures and economic returns of future production; integration of future acquisitions into the Company's existing operations; competition; operations and political conditions; regulatory environment in China and Canada; environmental risks; foreign exchange rate fluctuations; insurance; risks and hazards of mining operations; key personnel; conflicts of interest; dependence on management; internal control over financial reporting as per the requirements of the Sarbanes-Oxley Act; and bringing actions and enforcing judgments under U.S. securities laws.

This list is not exhaustive of the factors that may affect any of the Company's forward-looking statements or information. Forward-looking statements or information are statements about the future and are inherently uncertain, and actual achievements of the Company or other future events or conditions may differ materially from those reflected in the forward-looking statements or information due to a variety of risks, uncertainties and other factors, including, without limitation, those referred to in the Company's Annual Information Form for the year ended March 31, 2014 under the heading "Risk Factors". Although the Company has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be as anticipated, estimated, described or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information.

The Company's forward-looking statements and information are based on the assumptions, beliefs, expectations and opinions of management as of the date of this press release, and other than as required by applicable securities laws, the Company does not assume any obligation to update forward-looking statements and information if circumstances or management's assumptions, beliefs, expectations or opinions should change, or changes in any other events affecting such statements or information. For the reasons set forth above, investors should not place undue reliance on forward-looking statements and information.




SILVERCORP METALS INC.
Condensed Consolidated Interim Balance Sheets
--------------------------------------------------------------------------
(Unaudited) (Expressed in thousands of U.S. dollars)

June 30, March 31,
2014 2014
--------------------------------------------------------------------------
ASSETS
Current Assets
Cash and cash equivalents $ 68,813 $ 60,614
Short-term investments 11,422 12,864
Trade and other receivables 3,588 4,004
Inventories 5,433 5,362
Due from related parties 70 68
Prepaids and deposits 7,081 6,165
--------------------------------------------------------------------------
96,407 89,077

Non-current Assets
Long-term prepaids and deposits 3,606 4,000
Investment in an associate 3,712 3,715
Other investments 1,590 2,393
Plant and equipment 101,441 101,876
Mineral rights and properties 274,095 266,258
--------------------------------------------------------------------------
TOTAL ASSETS $ 480,851 $ 467,319
--------------------------------------------------------------------------
--------------------------------------------------------------------------

LIABILITIES AND EQUITY
Current Liabilities
Accounts payable and accrued liabilities $ 28,155 $ 23,802
Deposits received 7,805 7,031
Dividends payable 800 773
Income tax payable 2,106 515
Due to related parties 286 281
--------------------------------------------------------------------------
39,152 32,402
Non-current Liabilities
Deferred income tax liabilities 17,380 16,536
Environmental rehabilitation 5,868 5,819
--------------------------------------------------------------------------
--------------------------------------------------------------------------
Total Liabilities 62,400 54,757
--------------------------------------------------------------------------
Equity
Share capital 233,513 233,513
Share option reserve 10,843 10,492
Reserves 25,409 25,409
Accumulated other comprehensive loss (18,560) (20,141)
Retained earnings 102,937 100,993
--------------------------------------------------------------------------
--------------------------------------------------------------------------
Total equity attributable to the equity
holders of the Company 354,142 350,266
Non-controlling interests 64,309 62,296
--------------------------------------------------------------------------
Total Equity 418,451 412,562
--------------------------------------------------------------------------
--------------------------------------------------------------------------

TOTAL LIABILITIES AND EQUITY $ 480,851 $ 467,319
--------------------------------------------------------------------------
--------------------------------------------------------------------------

SILVERCORP METALS INC.
Condensed Consolidated Interim Statements of Income
--------------------------------------------------------------------------
(Unaudited) (Expressed in thousands of U.S. dollars, except for per share
figures)

Three Months Ended June 30,
-------------------------------
2014 2013
--------------------------------------------------------------------------

Sales $ 30,616 $ 39,835
Cost of sales 14,963 22,482
--------------------------------------------------------------------------
Gross profit 15,653 17,353

General and administrative 4,768 7,501
General exploration and property
investigation 909 1,048
Other taxes 672 595
Foreign exchange loss (gain) 1,125 (1,881)
Loss on disposal of plant and equipment - 28
Share of loss in associate 132 14
Loss on investments 15 574
Other income (156) (115)
--------------------------------------------------------------------------
Income from operations 8,188 9,589

Finance income 164 928
Finance costs (32) (33)
--------------------------------------------------------------------------
Income before income taxes 8,320 10,484

Income tax expense 3,685 4,000
--------------------------------------------------------------------------
Net income $ 4,635 $ 6,484
--------------------------------------------------------------------------
--------------------------------------------------------------------------

Attributable to:
Equity holders of the Company $ 2,744 $ 4,562
Non-controlling interests 1,891 1,922
--------------------------------------------------------------------------
$ 4,635 $ 6,484
--------------------------------------------------------------------------
--------------------------------------------------------------------------

Earnings per share attributable to the
equity holders of the Company
Basic earnings per share $ 0.02 $ 0.03
--------------------------------------------------------------------------
--------------------------------------------------------------------------
Diluted earnings per share $ 0.02 $ 0.03
--------------------------------------------------------------------------
--------------------------------------------------------------------------
Weighted Average Number of Shares
Outstanding - Basic 170,883,808 170,781,058
--------------------------------------------------------------------------
--------------------------------------------------------------------------
Weighted Average Number of Shares
Outstanding - Diluted 170,883,808 170,839,083
--------------------------------------------------------------------------
--------------------------------------------------------------------------

SILVERCORP METALS INC.
Condensed Consolidated Interim Statements of Cash Flow
--------------------------------------------------------------------------
(Unaudited) (Expressed in thousands of U.S. dollars)
Three Months Ended June 30,
-------------------------------
2014 2013
--------------------------------------------------------------------------
Cash provided by
Operating activities
Net (loss) income $ 4,635 $ 6,484
Add (deduct) items not affecting cash:
Unwinding of discount of environmental
rehabilitation 32 33
Depreciation, amortization and depletion 3,423 3,932
Share of loss in associate 132 14
Income tax expense (recovery) 3,685 4,000
Loss on investments 15 574
Loss on disposal of plant and equipment - 28
Share-based compensation 351 715
Income taxes paid (1,296) (3,349)
Changes in non-cash operating working
capital 2,849 5,261
--------------------------------------------------------------------------
--------------------------------------------------------------------------
Net cash provided by operating activities 13,826 17,692
--------------------------------------------------------------------------
--------------------------------------------------------------------------

Investing activities
Mineral rights and properties
Capital expenditures (6,305) (13,643)
Plant and equipment
Additions (1,578) (5,553)
Net redemptions of short-term investments 1,731 24,991
Proceeds on sale of a subsidiary (net of
cash disposed, $4) - 1,630
--------------------------------------------------------------------------
Net cash provided by (used in) investing
activities (6,152) 7,425
--------------------------------------------------------------------------
--------------------------------------------------------------------------

Financing activities
Related parties
Payments made - (1,207)
Cash dividends distributed (775) (4,160)
--------------------------------------------------------------------------
--------------------------------------------------------------------------
Net cash used in financing activities (775) (5,367)
--------------------------------------------------------------------------
--------------------------------------------------------------------------
Effect of exchange rate changes on cash and
cash equivalents 1,300 (400)
--------------------------------------------------------------------------
--------------------------------------------------------------------------
Increase in cash and cash equivalents 8,199 19,350
Cash and cash equivalents, beginning of the
period 60,614 72,283
Cash and cash equivalents included in
assets held for sale - (52)
--------------------------------------------------------------------------
Cash and cash equivalents, end of the
period $ 68,813 $ 91,581
--------------------------------------------------------------------------
--------------------------------------------------------------------------

SILVERCORP METALS INC.
Mining Data
--------------------------------------------------------------------------
(Expressed in thousands of U.S. dollars, except for mining data figures)

--------------------------------------------------------------------------
Three months ended June 30, 2014
------------------------------------
Ying Mining
District(1) BYP Total
--------------------------------------------------------------------------
Production Data
Mine Data
Ore Mined (tonne) 173,485 36,203 209,688
Run of Mine Ore (tonne) 169,480 30,548 200,028
Mining cost per tonne of ore mined
($) 58.35 30.61 53.56
Cash mining cost per tonne of ore
mined ($) 46.96 22.70 42.77
Non cash mining cost per tonne of
ore mined ($) 11.39 7.91 10.79
Unit shipping costs ($) 4.77 - 3.95
Milling cost per tonne of ore milled
($) 14.48 14.33 14.46
Cash milling cost per tonne of ore
milled ($) 12.16 13.29 12.33
Non cash milling cost per tonne of
ore milled ($) 2.32 1.04 2.13
Average Production Cost
Silver ($ per ounce) 7.60 - 7.72
Gold ($ per ounce) 434 573 483
Lead ($ per pound) 0.36 - 0.37
Zinc ($ per pound) 0.30 - 0.31
Total production cost per ounce of
Silver ($) 2.92 2.92
Total cash cost per ounce of Silver
($) 0.46 0.46
Total production cost per ounce of
Gold ($) 573 573
Total cash cost per ounce of Gold
($) 455 455
All-in sustaining cost per ounce of
Silver ($)(2) 8.85 15.06 11.62
All-in cost per ounce of Silver
($)(2) 11.03 16.06 14.58
Total Recovery of the Run of Mine
Ore
Silver (%) 93.6 93.6
Gold (%) 89.7 89.7
Lead (%) 95.8 95.8
Zinc (%) 56.8 56.8
Head Grades of Run of Mine Ore
Silver (gram/tonne) 227 227
Gold (gram/tonne) 2.8 2.8
Lead (%) 3.3 3.3
Zinc (%) 0.7 0.7
Sales Data
Metal Sales
Silver (in thousands of ounces) 1,126 - 1,126
Gold (in thousands of ounces) 0.8 2.6 3.5
Lead (in thousands of pounds) 11,529 - 11,529
Zinc (in thousands of pounds) 1,211 - 1,211
Metal Sales
Silver (in thousands of $) 17,778 - 17,778
Gold (in thousands of $) 741 2,681 3,422
Lead (in thousands of $) 8,654 - 8,654
Zinc (in thousands of $) 762 - 762
------------------------------------
------------------------------------
27,935 2,681 30,616
------------------------------------
Average Selling Price, Net of Value
Added Tax and Smelter Charges
Silver ($ per ounce) 15.79 - 15.79
Gold ($ per ounce) 901 1,016 989
Lead ($ per pound) 0.75 - 0.75
Zinc ($ per pound) 0.63 - 0.63

(1) Ying Mining District includes mines: SGX, TLP, HPG&LM
(2) BYP gold ounces converted to silver equivalent using a ratio of 50:1.

SILVERCORP METALS INC.
Mining Data
(Expressed in thousands of U.S. dollars, except for mining data figures)

--------------------------------------------------------------------------
Three months ended June 30, 2013
----------------------------------------------
Ying Mining
District(1) X Mines(2) BYP Total
--------------------------------------------------------------------------
Production Data
Mine Data
Ore Mined (tonne) 233,257 - 29,075 262,332
Run of Mine Ore (tonne) 236,173 6,929(i) 29,975 273,077
Mining cost per tonne of
ore mined ($) 65.09 - 51.17 63.55

Cash mining cost per
tonne of ore mined ($) 54.95 - 21.04 51.19
Non cash mining cost per
tonne of ore mined ($) 10.14 - 30.13 12.35
Unit shipping costs ($) 3.98 - - 3.54
Milling cost per tonne of
ore milled ($) 13.62 - 14.05 13.67
Cash milling cost per
tonne of ore milled ($) 12.06 - 13.06 12.17
Non cash milling cost per
tonne of ore milled ($) 1.56 - 0.99 1.50
Average Production Cost
Silver ($ per ounce) 9.63 - - 9.96
Gold ($ per ounce) 546 - 926 616
Lead ($ per pound) 0.41 - - 0.42
Zinc ($ per pound) 0.34 - 0.44 0.34
Total production cost per
ounce of Silver ($) 5.33 - 5.33
Total cash cost per ounce
of Silver ($) 3.23 - 3.23
Total production cost per
ounce of Gold ($) 913 913
Total cash cost per ounce
of Gold ($) 448 448
All-in sustaining cost per
ounce of Silver ($)(3) 11.36 - 26.78 15.51
All-in cost per ounce of
Silver ($)(3) 15.01 - 28.62 25.73
Total Recovery of the Run
of Mine Ore
Silver (%) 92.3 - 92.3
Gold (%) 92.5 92.5
Lead (%) 94.6 - 94.6
Zinc (%) 68.4 - 68.4
Head Grades of Run of Mine
Ore
Silver (gram/tonne) 200 - 200
Gold (gram/tonne) 2.8 2.8
Lead (%) 2.7 - 2.7
Zinc (%) 0.8 - 0.8
Sales Data
Metal Sales
Silver (in thousands of
ounces) 1,364 10(i) - 1,374
Gold (in thousands of
ounces) 1.3 0.2(i) 2.3 3.8
Lead (in thousands of
pounds) 13,063 405(i) - 13,468
Zinc (in thousands of
pounds) 2,926 484(i) 282 3,692
Metal Sales
Silver (in thousands of $) 24,091 - - 24,091
Gold (in thousands of $) 1,283 - 2,669 3,952
Lead (in thousands of $) 9,833 - - 9,833
Zinc (in thousands of $) 1,806 - 153 1,959
----------------------------------------------
37,013 - 2,822 39,835
----------------------------------------------
----------------------------------------------
Average Selling Price, Net
of Value Added Tax and
Smelter Charges
Silver ($ per ounce) 17.66 - 17.66
Gold ($ per ounce) 1,001 - 1,141 1,092
Lead ($ per pound) 0.75 - 0.75
Zinc ($ per pound) 0.62 - 0.54 0.61
(1) Ying Mining District includes mines: SGX, TLP, HPG&LM.
(2) X Mines includes the XBG project and XHP project.
(3) BYP gold ounces converted to silver equivalent using a ratio of 50:1.
(i) Represents development tunnelling ore at the X mines.



FOR FURTHER INFORMATION PLEASE CONTACT:
Silvercorp Metals Inc.
Lorne Waldman
Senior Vice President
(604) 669-9397 or Toll Free: 1 (888) 224-1881
investor@silvercorp.ca
www.silvercorp.ca

Loading...
Loading...
Market News and Data brought to you by Benzinga APIs
Posted In: Press Releases
Benzinga simplifies the market for smarter investing

Trade confidently with insights and alerts from analyst ratings, free reports and breaking news that affects the stocks you care about.

Join Now: Free!

Loading...