Rambler Files Lower Footwall Zone Prefeasibility Technical Report on SEDAR

Loading...
Loading...

LONDON, ENGLAND and BAIE VERTE, NEWFOUNDLAND and LABRADOR, CANADA--(Marketwired - September 09, 2015) - Rambler Metals and Mining plc, a Canadian copper and gold producer, explorer and developer (TSX VENTURE: RAB) RMM RMM ("Rambler" or the "Company") today reports that it has filed the NI43-101 technical report to accompany the pre-feasibility results previously announced on 20 July 2015.

The PFS was successful in defining a staged, low capital strategy for the optimisation of all existing infrastructure through the integration of the Lower Footwall Zone ('LFZ') mineral resource into the life of mine ('LOM') plan for the Ming Copper-Gold Mine. The operation will begin running at full capacity in 2018 at 1,250 metric tonnes per day ('mtpd') with a projected mine life of 21 years.

The results show positive economics, a strong Internal Rate of Return ('IRR') and significant cash flow under reasonable commodity price assumptions. In addition, there remain further opportunities for improvement as the operation becomes fully optimised.

All currency is expressed in Canadian dollars ($CDN) unless otherwise noted.

Click on, or paste the following link into your web browser, to view the associated PDF document.
http://www.rns-pdf.londonstockexchange.com/rns/5716Y_1-2015-9-9.pdf



FOR FURTHER INFORMATION PLEASE CONTACT:
RNS
Customer Services
0044-207797-4400
rns@londonstockexchange.com
http://www.rns.com

Market News and Data brought to you by Benzinga APIs
Posted In: Press Releases
Benzinga simplifies the market for smarter investing

Trade confidently with insights and alerts from analyst ratings, free reports and breaking news that affects the stocks you care about.

Join Now: Free!

Loading...