September 2018 Quarterly Report

Loading...
Loading...

NEW YORK, Oct. 31, 2018 (GLOBE NEWSWIRE) -- Piedmont Lithium Limited ((PLLPLLL ("Piedmont" or "Company") is pleased to present its September 2018 quarterly report.

Highlights during and subsequent to the quarter were:

  • Completed an updated Scoping Study for the Company's Piedmont Lithium Project ("Project"), located within the Carolina Tin-Spodumene Belt ("TSB") in the United States, which delivered outstanding results including:
    • compelling economics due to attractive capital and operating costs, significant by-product credits, short transportation distances, minimal royalties and low corporate income taxes;
    • a chemical plant producing 22,700tpa of lithium hydroxide supported by an open pit mine and concentrator producing 170,000tpa of 6% spodumene concentrate; and
    • by-product quartz (99,000tpa), feldspar (125,000tpa), and mica (15,500tpa) providing credits to the cost of lithium production;
  • Completed bench-scale metallurgical testwork program to produce consistent high-grade spodumene concentrates (Li2O>6.0%) with low iron content (Fe2O3<1%);
  • Completed Mineral Resource estimates and bench-scale metallurgical testwork for by-product quartz, feldspar and mica as by-products of spodumene concentrate from the Project;
  • Commenced permitting on the Project for all federal, state and local permits, which is targeted for completion in 2019;
  • Completed initial exploratory drilling on the Company's new Sunnyside and Central properties in the TSB, which returned encouraging results, including the Project's widest intercept to-date.

Next steps:

  • Piedmont will now move forward with a Pre-Feasibility Study ("PFS") on the Project, targeted for completion during 2019;
  • Additional drilling is planned on the core property to potentially extend the mine life by converting the new Exploration Target into a Mineral Resource;
  • Further metallurgical studies, including evaluating the potential for a Dense Medium Separation ("DMS") before the flotation circuit, to further enhance operating costs in the concentrator;
  • Complete permit applications and secure the necessary permits to commence mining and processing operations at the Project; and
  • Continued expansion of the Company's land position in the Carolina Tin-Spodumene Belt ("TSB") with a focus on areas of high mineral prospectivity.

Click here to view the quarterly report.

For further information, contact:
Keith D. Phillips   Anastasios (Taso) Arima
President & CEO   Executive Director
T: +1 973 809 0505   T: +1 347 899 1522
E: keith@piedmontlithium.com  E: taso@piedmontlithium.com

 

Loading...
Loading...
Market News and Data brought to you by Benzinga APIs
Posted In: Press Releases
Benzinga simplifies the market for smarter investing

Trade confidently with insights and alerts from analyst ratings, free reports and breaking news that affects the stocks you care about.

Join Now: Free!

Loading...