Loading...
Loading...
Independence Energy Corp.
IDNG provides this update regarding recent progress made at the Quinlan Lease oil property in Oklahoma.
The 120 acre Quinlan Lease property is comprised of 3 productive oils wells (Quinlan #1, #2, and #3) and 1 salt water disposal well. Over the last several months, significant infrastructure, production, and water handling upgrades were made at the site. The upgrades, which included the use of new coated tubing/casings, a new electrical transformer, a high-capacity submersible pump, and a variable speed drive, all appear to have been successful at better dealing with the high volume of salt water produced by the wells.
Optimization of the submersible pump at Quinlan #3 has successfully undergone three separate upward total fluid volume adjustments (800, 1000, and 1,200 bbls per day), each increasing net daily oil production. Project operators anticipate further testing the submersible pump and variable speed drive at several higher volume levels prior to making a decision regarding the optimum strategy to maximize the long-term productivity and reliability of the well. Testing is expected to continue for another 7-10 days.
© 2024 Benzinga.com. Benzinga does not provide investment advice. All rights reserved.
Posted In: News
Benzinga simplifies the market for smarter investing
Trade confidently with insights and alerts from analyst ratings, free reports and breaking news that affects the stocks you care about.
Join Now: Free!
Already a member?Sign in