Allied Gold Limited: 2 Million Ounces in Measured and Indicated Resources at Pigiput and Pigibo Deposits Increased by 170%

Share


TORONTO, ONTARIO--(Marketwire - March 9, 2010) - Allied Gold Limited (TSX: ALG)(AIM:AGLD)(ASX:ALD)

THIS PRESS RELEASE IS NOT FOR DISSEMINATION IN THE UNITED STATES AND SHALL NOT BE DISSEMINATED TO UNITED STATES NEWS SERVICES

HIGHLIGHTS



- New resource estimates for Pigiput and Pigibo deposits give total
Measured and Indicated Resources of 48.1 million tonnes at 1.35 g/t
gold, at 0.5g/t gold block cut-off, equivalent to 2.08 million ounces of
gold

- 170% increase in estimated contained gold in Measured and Indicated
resources compared to previous estimates

- Pigiput total Measured and Indicated resources estimated as 41.0 million
tonnes at 1.38 g/t gold for 1.82 million ounces of gold

- Pigibo total Measured and Indicated resources estimated as 7.1 million
tonnes at 1.18 g/t gold for 0.27 million ounces of gold

- Total group combined Measured and Indicated Resources of 107.9 million
tonnes at 1.39 g/t gold for 4.83 million ounces of gold (Simberi, 78.4
million tonnes at 1.27 g/t for 3.20 million ounces of gold and Gold
Ridge, 29.5 million tonnes at 1.72 g/t for 1.63 million ounces of gold).

- Reserve estimation to be undertaken on completion of Phase III drilling
at Pigibo, Pigiput and north-east towards SE Sorowar




Allied Gold has received new resource estimates for Pigiput and Pigibo deposits from consultants, Golder and Associates, totalling 48.1Mt @ 1.38g/t Au in Measured and Indicated categories for 2.08 million ounces of gold, using a 0.5g/t Au block cut-off. Mineral Resources classified as Inferred are estimated to be 38.5Mt @ 1.00 g/t Au for 1.24 Moz of gold and 86.6Mt @ 3.70g/t Ag for 10.3 Moz of silver. Compared to the previous estimates, this represents a significant consolidation, with the equivalent of net 30.4 Mt @ 1.34 g/t Au (1.31 Moz gold) converted to Measured and Indicated, and net expansion of total resources, by 29.4Mt @ 1.04g/t Au (0.98 Moz gold).

Phase III drilling is on-going with efforts focussed on testing down dip at Pigipbo and the open north eastern side of Pigiput. A further seventeen (17) diamond core holes for 4,360 metres, have been completed since the resource database close-off and two (2) are in progress. The holes are part of a phased in-fill and step-out program, commenced in May 2009, designed to support the A$10 million Sulphide and Oxide Expansion Studies based around the Pigiput Deposit. These studies target increasing total oxide and sulphide production to in excess of 200,000oz p.a. by 2012.

A particular focus of the Phase III programme is to test the presently open north-eastern limit of Pigiput, with the aim of establishing a link with known mineralisation already immediately north at southeast Sorowar.

The new estimates for Pigiput and Pigibo bring Allied Gold's total Measured and Indicated Resources at the flagship Simberi Gold Mine (PNG) and the Gold Ridge Project (Solomon Islands) to 4.81 million ounces being:

Simberi(1) 78.4Mt @ 1.27 g/t Au for 3.20 Moz of gold

Gold Ridge(2) 29.5Mt @ 1.72 g/t Au for 1.63 Moz of gold

In addition, estimated Inferred Resources increase to 2.97 million ounces being:

Simberi(1) 78.2Mt @ 0.99 g/t Au for 2.49 Moz of gold

Gold Ridge(2) 8.3Mt @ 1.80 g/t Au for 0.48 Moz of gold

This equates to a total Measured, Indicated and Inferred Resource for Simberi and Gold Ridge of 194.4 Mt @ 1.25 g/t Au for 7.8 Moz of gold.

NOTES

(1) Simberi Total Gold Resources May 2009 - Above 0.5g/t Au Cut-off Grade as quoted in ALD Annual Report 08 / 09 with Pigiput and Pigibo resources updated by this February 2010 estimate

(2) Gold Ridge Total Resources as quoted in ALD Preliminary Short Form Prospectus November 13, 2009

OVERVIEW

Allied Gold is actively undertaking in-fill and step-out diamond core drilling of the Pigiput Prospect, in the central part of its 100% owned mining lease ML136 (Figure 1). The Phase II program was completed at end January 2010 and Phase III will continue through the March '10 Quarter.

The Pigiput Deposit is currently the subject of a Sulphide Development pre-feasibility study (as outlined in ALD Press Release dated 17th June 2009). ML136, the mining lease on Simberi Island, is owned 100% by Allied Gold Limited. The new mineral resource estimate, along with the results of the Phase III drilling, is to be used to determine mining reserves to be included in the study.

In this new estimate, Measured and Indicated resources in sulphides for the two deposits now total 33.8Mt @ 1.49 g/t Au for 1.62 Moz gold at a 0.5g/t Au block assay cut-off.



Table 1 Pigiput and Pigibo Minerals Resources - February 2010
----------------------------------------------------------------------------
Deposit / Prospect Measured Indicated
----------------------------------------------
Mt g/t Au koz Mt g/t Au koz
----------------------------------------------------------------------------
Pigiput
----------------------------------------------------------------------------
oxide 3.4 0.96 106 5.0 0.97 154
----------------------------------------------------------------------------
transitional 1.9 0.90 54
----------------------------------------------------------------------------
sulphide 30.7 1.52 1501
----------------------------------------------------------------------------
PIG-Total 3.4 0.96 106 37.5 1.42 1709
----------------------------------------------------------------------------
Pigibo
----------------------------------------------------------------------------
oxide 2.6 1.14 97
----------------------------------------------------------------------------
transitional 1.4 1.19 52
----------------------------------------------------------------------------
sulphide 3.1 1.20 120
----------------------------------------------------------------------------
PBO-Total 7.1 1.18 269
----------------------------------------------------------------------------
TOTAL 3.4 0.96 106 44.6 1.38 1,978
----------------------------------------------------------------------------

----------------------------------------------------------------------------
Deposit / Prospect Total MEAS + IND Inferred
----------------------------------------------
Mt g/t Au koz Mt g/t Au koz
----------------------------------------------------------------------------
Pigiput
----------------------------------------------------------------------------
oxide 8.4 0.96 260 1.6 0.79 40
----------------------------------------------------------------------------
transitional 1.9 0.90 54 0.6 0.85 17
----------------------------------------------------------------------------
sulphide 30.7 1.52 1501 27.3 0.98 861
----------------------------------------------------------------------------
PIG-Total 41.0 1.38 1815 29.5 0.97 920
----------------------------------------------------------------------------
Pigibo
----------------------------------------------------------------------------
oxide 2.6 1.14 97 1.6 1.03 53
----------------------------------------------------------------------------
transitional 1.4 1.19 52 0.3 1.08 11
----------------------------------------------------------------------------
sulphide 3.1 1.20 120 7.1 1.12 256
----------------------------------------------------------------------------
PBO-Total 7.1 1.18 269 9.0 1.10 320
----------------------------------------------------------------------------
TOTAL 48.1 1.35 2,084 38.5 1.00 1,239
----------------------------------------------------------------------------
Note: Total pre-mine Mineral Resources. Table shows rounded estimates. This
rounding may cause some apparent computational discrepancies.



To view Figure 1 Pigibo - Pigiput Prospects, please visit the following link: http://media3.marketwire.com/docs/ALGfig1.pdf

PIGIPUT RESOURCE ESTIMATE

Using additional geological and assay information gained from the intensive 2009 drilling campaign, a new resource estimate was undertaken by consultants, Golder Associates. At Pigiput, estimated Measured and Indicated resources now total 41.0Mt @ 1.38 g/t gold for 1.82 million ounces, with a further 29.5Mt @ 0.97 g/t (0.92 Moz) classified as Inferred. Inferred silver resources at Pigiput total 70.4 Mt @ 4.09 g/t silver for 9.3 million ounces. The bulk of these Measured and Indicated resources, 30.7 Mt @ 1.52g/t for 1.50 Moz, are in sulphides. Previously, estimated Measured and Indicated resources totalled 17.7 Mt @ 1.36 g/t for 0.77 Moz, with a further 36.0 Mt @ 1.24 g/t gold for 1.43 Moz gold classified as Inferred, (ALD Media Release 20th May 2009).



Table 2 Pigiput Mineral Resources - Current (this release, Feb '10) compared
to Previous (May '09)
----------------------------------------------------------------------------
PREVIOUS MAY '09 Estimate Measured Indicated

Mt g/t Au koz Mt g/t Au koz
----------------------------------------------------------------------------
oxide 4.1 0.97 128 3.3 0.92 98
transition 0.3 1.13 11
sulphide 10.0 1.67 537
Total 4.1 0.97 128 13.6 1.48 645
----------------------------------------------------------------------------

----------------------------------------------------------------------------
PREVIOUS MAY '09 Estimate Total MEAS + IND Inferred

Mt g/t Au koz Mt g/t Au koz
----------------------------------------------------------------------------
oxide 7.4 0.95 226 0.9 0.94 27
transition 0.3 1.14 11 1.4 0.83 37
sulphide 10.0 1.67 537 33.7 1.26 1,365
Total 17.7 1.36 773 36.0 1.24 1,430
----------------------------------------------------------------------------

----------------------------------------------------------------------------
CURRENT FEB '10 Estimate Measured Indicated

Mt g/t Au koz Mt g/t Au koz
----------------------------------------------------------------------------
oxide 3.4 0.96 106 5.0 0.97 154
transition 1.9 0.90 54
sulphide 30.7 1.52 1,501
Total 3.4 0.96 106 37.5 1.42 1,709
----------------------------------------------------------------------------


----------------------------------------------------------------------------
CURRENT FEB '10 Estimate Total MEAS + IND Inferred

Mt g/t Au koz Mt g/t Au koz
----------------------------------------------------------------------------
oxide 8.4 0.96 260 1.6 0.79 40
transition 1.9 0.90 54 0.6 0.85 17
sulphide 30.7 1.52 1,501 27.3 0.98 861
Total 41.0 1.38 1,815 29.5 0.97 920
----------------------------------------------------------------------------
Note: Total pre-mine Mineral Resources. Table shows rounded estimates. This
rounding may cause some apparent computational discrepancies.



Phases I and II Pigiput Sulphide Project core drilling programmes completed in 2009 were designed as sets of multiple radiating holes, drilled from 4 principal drill sites, Figure 2. The holes were designed to increase the drill hole density in areas already known to be mineralised and include drilling directions that pierce the mineralised envelopes at oblique angles to the dip and strike of the mineralised formations. The true width of a down hole intercept varies significantly, depending on the angle the hole intersects the mineralised structures.

These results from the two drilling programs have now been consolidated into an expanded drill hole database allowing an improved 3D model to be developed for the February 2010 resource estimate. The new resource estimate used 336 holes totalling 51,856 m compared to 290 holes for 37,445 m that comprised the database for the May '09 estimate.

To view Figure 2 Pigiput Prospect - Collar locations, please visit the following link: http://media3.marketwire.com/docs/ALGfig2.pdf

Figure 3, below, a SW-looking oblique section (location shown as line A-B on Figure 2), illustrates the relationship of intercepts in drill holes to blocks in the new Feb 2010 resource estimate with grades greater than or equal to 0.5g/t. Blocks are colour coded by estimated gold grade. Limits of blocks categorised as Measured, Indicated and Inferred are also shown.

To view Figure 3 Pigiput Prospect - Oblique section, please visit the following link: http://media3.marketwire.com/docs/ALGfig3.pdf

The February 2010 Mineral Resource for Pigiput is illustrated in Figure 4, a plan view at 0mRL, approximately 120m below surface in the central part of the drawing,. Only blocks with gold grades greater than or equal to 0.5g/t Au are sown. Assay results are awaited for holes SDH076 and SHH079 drilled in the area where the new resource is open to the north east.

To view Figure 4 Pigiput Level Plan at 0mRL, please visit the following link: http://media3.marketwire.com/docs/ALGfig4.pdf

At Pigiput, gold mineralisation is generally associated with a moderately north dipping, east-west striking structural surface that can be interpreted across the entire extent of the deposit. The surface is recognised in core holes as a discrete structurally deformed zone. Steep dipping structures, particularly those striking NNW can also be mineralised. Gold grades are generally highest at the main surface and significant mineralisation may occur in subsidiary structures above and, to a lesser extent, below it. The main surface, interpreted as a fault zone, also marks a change from clay-pyrite and silica-carbonate-pyrite alteration zones in the brecciated tuff and porphyry host rocks at and above it to chlorite dominated alteration below.

The planned Phase III drilling will test for a north eastern extension of the Pigiput deposit into SE Sorowar, an area already known to be mineralised. The drilling will seek to better define and link the two mineralised bodies. The planned Phase II drilling is illustrated below on plan, Figure 5, and in section, Figure 6.

To view Figure 5 Pigibo - Sorowar Prospects plan, please visit the following link: http://media3.marketwire.com/docs/ALGfig5.pdf

To view Figure 6 Pigibo - Sorowar Prospects section, please visit the following link: http://media3.marketwire.com/docs/ALGfig6.pdf

PIGIBO RESOURCE ESTIMATE

At Pigibo, newly estimated Indicated mineral resources total 7.1Mt @ 1.18 g/t gold for 0.27 million ounces, with a further 9.0Mt @ 1.10 g/t (0.32 Moz) classified as Inferred resources. No resources are classified as Measured. Previously, all resource were classified as Inferred and totalled 3.5 Mt @ 1.26 g/t gold for 0.14 Moz gold (summarised in ALD Annual Report 08 / 09). This represents a net expansion of total resources at Pigibo of 12.7 Mt @ 1.10 g/t, equivalent to 0.45 Moz of gold. Indicated resources in sulphides at Pigibo are estimated to total 3.1 Mt @ 1.20 g/t Au, 0.12 Moz of gold.

Table 3 Pigibo Mineral Resources - Current (this release, Feb '10) compared to Previous (1998)



----------------------------------------------------------------------------
PREVIOUS 1998 Estimate Measured Indicated

Mt g/t Au koz Mt g/t Au koz
----------------------------------------------------------------------------
oxide
transitional
sulphide
Total
----------------------------------------------------------------------------

----------------------------------------------------------------------------
PREVIOUS 1998 Estimate Total MEAS + IND Inferred

Mt g/t Au koz Mt g/t Au koz
----------------------------------------------------------------------------
oxide 2.1 1.10 74
transitional
sulphide 1.4 1.50 68
Total 3.5 1.26 142
----------------------------------------------------------------------------

----------------------------------------------------------------------------
CURRENT FEB '10 Estimate Measured Indicated
Mt g/t Au koz Mt g/t Au koz
----------------------------------------------------------------------------
oxide 2.6 1.14 97
transitional 1.4 1.19 52
sulphide 3.1 1.20 120
Total 7.1 1.18 269
----------------------------------------------------------------------------


----------------------------------------------------------------------------
CURRENT FEB '10 Estimate Total MEAS + IND Inferred
Mt g/t Au koz Mt g/t Au koz
----------------------------------------------------------------------------
oxide 2.6 1.14 97 1.6 1.03 53
transitional 1.4 1.19 52 0.3 1.08 11
sulphide 3.1 1.20 120 7.1 1.12 256
Total 7.1 1.18 269 9.0 1.10 320
----------------------------------------------------------------------------
Note: Total pre-mine Mineral Resources .Table shows rounded estimates. This
rounding may cause some apparent computational discrepancies.



The current resource estimate used 97 holes totalling 11,208 m compared to 40 holes for 3,745 m that comprised the database for the previous (1998) estimate, Figure 7.

At Pigibo, gold mineralisation largely occurs in a crackle-brecciated porphytic andesite that intrudes a sequence of volcanic tuffs. Gold mineralization at Pigibo is associated with arsenian pyrite, slightly elevated copper values (average 170ppm) and otherwise low base metals levels, similar to the upper parts of the Pigiput Deposit.

To view Figure 7 Pigibo Prospect - Collar locations of holes drilled pre-2009, please visit the following link: http://media3.marketwire.com/docs/ALGfig7.pdf

To view Figure 8 Pigibo Prospect - Section 43550mE illustrating drill hole traces, please visit the following link: http://media3.marketwire.com/docs/ALGfig8a.pdf

PIGIPUT and PIGIBO 2010 MINERAL RESOURCE STATEMENT - Comments

Allied Gold Limited (Allied) commissioned Golder Associates Pty Ltd (Golder) to combine and update the Pigiput and Pigibo deposit resource models on Simberi Island in February 2010. The combined model is based on the geological database as at 28 January 2010. The database includes RC and Diamond drill holes and some Diamond Core 'tails'.

Geological modelling of the deposit was undertaken by Carmel Grant (Resource Geologist) and Phil Davies (Chief Geologist) from Allied. Construction of the block model and grade estimation was undertaken by Stephen Godfrey (Associate, Senior Resource Geologist) and reviewed by Richard Gaze (Principal). For this update, the oxide, transition and sulphide resource was modelled and estimated for gold (Au), silver (Ag) and sulphur (S).

Drill sample data was composited to five metres and flagged using oxide, transition and sulphide wireframes. The composites were also flagged as being in Tuff or Andesite. The flagged composites were used to estimate their corresponding geological/weathering domains in the block model.

Grade estimations were done using Ordinary Kriging. High grade restraining was applied to restrict the influence of high grade composites.

Dry Bulk Density values were applied to the model based on depth below surface. Independent regression equations were developed for the Oxide, Transition and Sulphide zones in Pigibo and Pigiput.

The Au estimation has been classified as Measured, Indicated and Inferred based on data quality and density. The Measured Resource is confined to the oxide material at Pigiput. The Indicated Resource has a nominal data density of 50m by 50m and the Inferred Resource100m by 100m. All resource west of 43400mE is Inferred. Material south of the interpreted mineralisation footwall and outside the Inferred Resource boundary is not classified due to insufficient data density. Due to the under sampling of the historical drilling, Ag and S are classified as Inferred.

The model has been reported as Pigibo from 43210mE to 44000mE and as Pigiput from 44000mE to 44900mE. Both areas extended from 208600mN to 209350mN.

This Mineral Resource statement has been compiled in accordance with the guidelines defined in the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code - 2004 Edition) and is compliant with Canadian National Instrument 43-101. An updated National Instrument 43-101 technical report will be available on SEDAR within 45 days.

Stephen Godfrey is a member of the Australasian Institute of Mining and Metallurgy and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code - 2004 Edition), and is a "qualified person" under National Instrument 43-101. Mr. Godfrey has reviewed and approved the contents of this news release.

Yours faithfully

ALLIED GOLD LIMITED

Mark V. Caruso, Executive Chairman



Board of Directors:

Mark Caruso
Executive Chairman & CEO

Monty House
Non Executive Director

Tony Lowrie
Non Executive Director

Greg Steemson
Non Executive Director

Frank Terranova
Executive Director & CFO

Peter Torre
Company Secretary

Principal Office

34 Douglas Street
Milton, Queensland 4064

Telephone +61 7 3252 5911
Facsimile +61 7 3252 3552
Email info@alliedgold.com.au

Website: www.alliedgold.com.au

Postal Address

PO Box 2019, Milton 4064

Registered Office

Unit B9, 431 Roberts Road
Subiaco, WA 6008

Share Registry

Computershare Investor Services
Level 2,
Reserve Bank Building
45 St Georges Terrace
Perth, Western Australia
WA 6000



Competent Persons

The information in this Stock Exchange Announcement that relates to Mineral Exploration results and Mineral Resources, together with any related assessments and interpretations, have been verified by and approved for release by Mr P R Davies, MSc, BSc, M.Aus.I.M.M., a qualified geologist and full-time employee of the Company. Mr Davies has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves", and is a "qualified person" under National Instrument 43-101. Mr Davies has reviewed and approved the contents of this news release. Mr Davies consents to the inclusion of the information contained in this ASX release in the form and context in which it appears.

The information in this Stock Exchange Announcement that relates to Mineral Resources has been compiled by Mr S Godfrey of Golder Associates who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Godfrey has had sufficient experience in Ore Resource estimation relevant to the style of mineralisation and type of deposit under consideration to qualify as a Competent Person as defined in the 2004 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves", and is a "qualified person" under National Instrument 43-101. Mr Godfrey has reviewed and approved the contents of this news release. Mr Godfrey consents to the inclusion of the information contained in this ASX release in the form and context in which it appears.

Forward-Looking Statements

This press release contains forward-looking statements concerning the projects owned by Allied Gold. Statements concerning mineral reserves and resources may also be deemed to be forward-looking statements in that they involve estimates, based on certain assumptions, of the mineralisation that will be found if and when a deposit is developed and mined. Forward-looking statements are not statements of historical fact, and actual events or results may differ materially from those described in the forward-looking statements, as the result of a variety of risks, uncertainties and other factors, involved in the mining industry generally and the particular properties in which Allied has an interest, such as fluctuation in gold prices; uncertainties involved in interpreting drilling results and other tests; the uncertainty of financial projections and cost estimates; the possibility of cost overruns, accidents, strikes, delays and other problems in development projects, the uncertain availability of financing and uncertainties as to terms of any financings completed; uncertainties relating to environmental risks and government approvals, and possible political instability or changes in government policy in jurisdictions in which properties are located.

Forward-looking statements are based on management's beliefs, opinions and estimates as of the date they are made, and no obligation is assumed to update forward-looking statements if these beliefs, opinions or estimates should change or to reflect other future developments.

Not an offer of securities or solicitation of a proxy

This communication is not a solicitation of a proxy from any security holder of Allied Gold, nor is this communication an offer to purchase or a solicitation to sell securities. Any offer will be made only through an information circular or proxy statement or similar document. Investors and security holders are strongly advised to read such document regarding the proposed business combination referred to in this communication, if and when such document is filed and becomes available, because it will contain important information. Any such document would be filed by Allied Gold with the Australian Securities and Investments Commission, the Australian Stock Exchange and applicable Canadian securities regulators.

BACKGROUND

Allied Gold Limited's gold production and exploration development portfolio is centred on the Tabar Islands of Papua New Guinea approximately 60 kilometres from Lihir Island which hosts a plus 40 million ounce gold resource and the Gold Ridge Project located on the Island of Guadalcanal in the Solomon Islands.(see diagram below).

In 2008-2009, Allied produced 72,609 ounces of gold. Studies have been completed on an expansion of the oxide plant from 2 Mtpa to 3 Mtpa to increase production to 100,000 oz pa. A study focused on the sulphide resources is looking at the optional configuration for 100,000 oz pa sulphide operation In addition the Company proposes to redevelop the Gold Ridge Project in the Solomon Islands by 2011 which will which will produce on average 120,000ozpa over the expected life of mine of 7 years. Total group production is projected to be in excess of 300,000oz by 2012.

Total group combined Measured, Indicated and resources stand at 4.83Moz of gold. Simberi currently hosts Measured, Indicated and Inferred mineral resources of approximately 3.2 million ounces of gold. Gold Ridge hosts approximately 1.63Moz of Measured, Indicated resources. Allied Gold currently owns 100% of Simberi and 100% of the EL on the nearby Tatau and Big Tabar Islands covering a total area of 170km(2) and 130km(2) of exploration tenure in the Solomon Islands respectively.

To view Figure 9, please visit the following link: http://media3.marketwire.com/docs/ALGfig9.pdf


 
 
Share
Printer-friendly version
Send to friend
We're Loving

Benzinga's Premium Memberships

From Benzinga's Newsdesk

Benzinga's News Delivered Free

Brain Trust

Special Offers:
Quick Cash Advance