FX Energy Reports Lisewo-2 Well to be Completed for Production

Loading...
Loading...
FX Energy
FXEN
reported that the Lisewo-2 well will be completed for production prior to further testing.  The well was drilled to a depth of 3,779 meters and cased to the top of the Rotliegend target reservoir.  A total of 27 meters were cored at the top of the reservoir which showed excellent reservoir quality and gas saturation similar to the Lisewo-1 well.  Planned operations call for completing the well for production. At that time a full scale production test will be done to determine the production parameters. The Lisewo-2 well was drilled to accelerate production from the Lisewo structure originally discovered by the Lisewo-1 well.  The Lisewo production facility, scheduled to begin producing before the end of the year, is designed to serve both Lisewo-1 and Lisewo-2, in addition to the Komorze-3 well. All three of these wells are located in the Fences concession where the Polish Oil and Gas Company (PGNiG) is the operator and owns 51% of the working interest; FX Energy owns 49%. Szymanowice-1 well.  The Szymanowice-1 well has reached the base of the Zechstein at a depth of 3,595 meters.  The next operations will include setting and cementing
See full press release
Market News and Data brought to you by Benzinga APIs
Posted In: NewsGuidanceFinancingContractsLegalManagementGlobal
Benzinga simplifies the market for smarter investing

Trade confidently with insights and alerts from analyst ratings, free reports and breaking news that affects the stocks you care about.

Join Now: Free!

Loading...