Loading...
Loading...
JinkoSolar Holding Co., Ltd.
JKS today announced the successful completion of a 35.8kW tracker-based solar system at the Aquarion Water Company's D.W. Loiselle Water Treatment Plant at Trap Falls Reservoir in Shelton, Connecticut. This project utilizes 29.7kW of JinkoSolar's PV modules in conjunction with OPEL Solar's utility scale tracker to offset the power Aquarion purchases from the local utility for their operations.
© 2024 Benzinga.com. Benzinga does not provide investment advice. All rights reserved.
Benzinga simplifies the market for smarter investing
Trade confidently with insights and alerts from analyst ratings, free reports and breaking news that affects the stocks you care about.
Join Now: Free!
Already a member?Sign in